    What is a bill of materials?

    The list of everything needed to make one product: the raw materials, the parts and the quantity of each. It tells everyone what goes into a product, what you must buy in and roughly what it costs. In production that list is called a bill of materials.

    In practice

    What it means for your SME

    A small producer makes a wooden table. One table needs a top, four legs, screws and a coat of varnish. Once that is fixed, you know for ten tables exactly what to buy and what comes off the stock.

    A list can have several levels. A part you make yourself, a semi-finished product, then has its own list with its own raw materials. That way a product is built from parts that are themselves made from parts. Each part has its own item number, so it can be found without doubt.

    What goes wrong without one? Someone estimates the quantities from memory, and stock runs out at the wrong moment. Or a product is made in two variants but the list fits only one. The cost price also becomes unreliable if the list lags behind what is really used.

    Make sure the list matches practice. If the shop floor uses a different part from the one on paper, the list needs updating. Keep one person responsible for changes. Anyone who wants to plan from the list ends up at MRP, the calculation of what to buy or make and when.

    A good list is above all an agreement: this is what goes in, and this is how we make it. So a new variant or a changed design also means an updated list, before the first order is planned. That prevents the workshop from carrying on with the old version while purchasing already orders something different. Keep the old version for reference, but make clear which one is current.

    Uniconta

    How it works in Uniconta

    According to uniconta.com you can work with bills of materials containing raw materials, semi-finished products and components, and with phantom items that let you nest one bill inside another.